DPWH resumes Marawi road network construction

To help revitalize the area’s economy, the Department of Public Works and Highways (DPWH) disclosed that it has resumed the road rehabilitation project in Marawi City.

Public Works Secretary Mark Villar said that the rehabilitation of Marawi Transcentral Road Phase 1 (which is under a grant aid program from Japan International Cooperation Agency) has provided better access to basic services, increase trade movements, and contribute to the progressing economic activities in Marawi City, Lanao Del Sur.  

Villar shared that two of the three contract packages (CPs) were completed, with the remaining package on final finishing touches involving ancillary or drainage works are to be finished by the end of this month.

DPWH continues building road network in Marawi

Meanwhile, Undersecretary for Unified Project Management Office (UPMO) Operations Emil Sadain said that the 18.97-kilometer Marawi Transcentral Road Phase 1 is first among the significant projects in the government’s comprehensive plan for the reconstruction and development for a "greater Marawi."  

The 5.45-kilometer Contract Package 1-B (which covers the design and construction of Bacong-Poona-Marantao-Marawi Road, GMA Terminal Access, Marawi-Cadre-New Capitol, Marcos Boulevard, and Idarus Road Section) was completed by joint Al Hussein Construction/N.B. Salbo Construction .

The road network capacity improvement for the MSU-GMA Road and Lumindong-Amaipakpak Avenue under Contract Package 2 that has a total length of 3.90 kilometers was earlier completed by Kouzbary Builders. 

DPWH continues building road network in Marawi 

Further, Sadain — in his inspection of the Marawi Transcentral Road — ordered Woodfields Consultants, Inc. and the joint venture contractors Unimasters Conglomeration Incorporated/MMA Achievers Construction and Development Corporation/CDH Construction/ Flying Seven Construction to work together to complete the all the remaining civil works for the 9.41-kilometer Bacong-Iligan-Marawi Road Section under contract package 1A this month.  

The on-going packages under Marawi Transcentral Road Project Phase 3 are as follows:

-          Package 3A: 4.87 kilometers that consist of Cabingan-MSU Campus-Amai Pakpak Avenue (Road 6), MSU Campus-Matampay-Marantao Road (Road 7), and Rapasa-Bayaba Road (Road 20);

-          Package 3B: 4.92 kilometers that cover Emie-Sagonsongan-Linao-Lantian Road (Road 9-1), MSU-Bubo Road (Road 13), and Rantian-Paling Road (Road 14);

-          Package 3C: 4.34 kilometers made up of Linao-Alinan Road (Road 15), Emie-Sagunsungan-Linao-Rantian Road (Road 9-2), Rorogagus-Mipaga Road (Road 25), and Bito-Mipaga-Marawi Road (Road 26); and

-          Package 3D: 4.65 kilometers composed of Bacong-Poona-Marantao-Marawi Road (Road 2-3); Bito-Rorogagus-Guimba Road (Road 11); and Tampilong Road (Road 28).  

DPWH continues building road network in Marawi

Moreover, DPWH noted that the improvement of roads in Marawi City and surrounding areas is among the national government’s infrastructure flagship projects in support of the transition to Bangsamoro government that will help boost peacebuilding efforts and open up opportunities for people to improve their quality of life. 

Photos from Department of Public Works and Highways

Also read:

DPWH: Build, Build, Build program created 6.57-M jobs in 4 years

Marawi Road Network Reconstruction Begins

DPWH Opens New Road Named After First Fallen Soldier in Marawi Siege

Read All

Featured Articles

Recommended Articles For You

Read All

Featured Cars

  • Upcoming

Car Articles From Zigwheels

  • News
  • Article Feature
  • Advisory Stories
  • Road Test
  • New Isuzu PH chief says current D-Max to stay for a while
    New Isuzu PH chief says current D-Max to stay for a while
    Paulo Papa . Apr 25, 2025
  • GAC Honda GT, Dongfeng Honda GT showcased at Auto Shanghai 2025
    GAC Honda GT, Dongfeng Honda GT showcased at Auto Shanghai 2025
    Cesar Miguel . Apr 25, 2025
  • ‘BMW Demo Fest’ lets PH buyers shop for cars at trimmed-down prices
    ‘BMW Demo Fest’ lets PH buyers shop for cars at trimmed-down prices
    Ruben Manahan IV . Apr 24, 2025
  • Mazda unveils EZ-60 at Auto Shanghai 2025
    Mazda unveils EZ-60 at Auto Shanghai 2025
    Cesar Miguel . Apr 24, 2025
  • Omoda, Jaecoo showcase latest NEV models at Auto Shanghai 2025
    Omoda, Jaecoo showcase latest NEV models at Auto Shanghai 2025
    Cesar Miguel . Apr 24, 2025
  • Mazda BT-50: old vs. new
    Mazda BT-50: old vs. new
    Cesar Miguel . Apr 24, 2025
  • Check out the Suzuki Dzire Hybrid's 2 trims
    Check out the Suzuki Dzire Hybrid's 2 trims
    Cesar Miguel . Apr 24, 2025
  • Here’s what inside the BYD eMAX 7
    Here’s what inside the BYD eMAX 7
    Cesar Miguel . Apr 23, 2025
  • BYD Shark 6 DMO vs. Changan Nevo Hunter REEV
    BYD Shark 6 DMO vs. Changan Nevo Hunter REEV
    Paulo Papa . Apr 23, 2025
  • Here’s what to expect on the road this Holy Week
    Here’s what to expect on the road this Holy Week
    Paulo Papa . Apr 16, 2025
  • What should you visit first at MIAS 2025?
    What should you visit first at MIAS 2025?
    Cesar Miguel . Apr 11, 2025
  • Do you really need 4x4 for overlanding?
    Do you really need 4x4 for overlanding?
    Cesar Miguel . Mar 26, 2025
  • Number coding 2025: what you need to know
    Number coding 2025: what you need to know
    Paulo Papa . Mar 09, 2025
  • EVs still require lubrication, JAMA execs say
    EVs still require lubrication, JAMA execs say
    Paulo Papa . Mar 09, 2025
  • Ensure your vehicle is Summer road trip-ready by following these tips
    Ensure your vehicle is Summer road trip-ready by following these tips
    Paulo Papa . Mar 06, 2025
  • First drive: Changan Lumin
    First drive: Changan Lumin
    Cesar Miguel . Apr 22, 2025
  • JAC JS4: from daily drives to ‘vacay’ vibes
    JAC JS4: from daily drives to ‘vacay’ vibes
    Paulo Papa . Apr 22, 2025
  • First drive: Jetour X70 Lightning i-DM
    First drive: Jetour X70 Lightning i-DM
    Paulo Papa . Apr 03, 2025
  • Changan CS15: no-fuss daily driver
    Changan CS15: no-fuss daily driver
    Cesar Miguel . Mar 27, 2025
  • First drive: Mercedes-Benz EQE 350+ AMG Line
    First drive: Mercedes-Benz EQE 350+ AMG Line
    Paulo Papa . Mar 21, 2025