Marcos Jr. leads CAVITEX milestone events

Marcos Jr. joined by DPWH Secretary Bonoan, MPTC Chair Manny Pangilinan

Marcos Jr at CAVITEX 2

President Ferdinand Marcos Junior (Jr.) has led groundbreaking and inauguration ceremonies along sections of the Manila-Cavite Expressway (CAVITEX).

KEY TAKEAWAYS

  • For how long will the CAVITEX C5 Link Sucat Interchange remain toll-free?

    The CAVITEX C5 Link Sucat Interchange will remain toll-free for one month.
  • BY how much will the CAVITEX C5 Link cut travel time in the south?

    Per DPWH, travel time from SLEX/C5 and CAVITEX will be shortened from 40-10 minutes once the project is complete.
  • The country’s figurehead was present in various events held on the CAVITEX C5 Link and Cavite-Laguna Expressway (CALAX) Link Project. He was joined by Department of Public Works and Highways (DPWH) Secretary Manuel Bonoan and project concessionaire Metro Pacific Tollways Corporation (MPTC) Chairman Manuel Pangilinan.

    Also present were Senator Mark Villar, Department of Transportation Secretary Jaime Bautista, Philippine Reclamation Authority General Manager Cesar Siador, MPTC President and Chief Executive Rogelio Singson, and DPWH Undersecretary Maria Catalina Cabral.

    Marcos Jr. participated in the inauguration of the 1.9-kilometer Segment 2 or the Sucat Interchange of CAVITEX C5 Link which now connects CAVITEX Interchange to the Sucat Interchange of the project.

    No fees will be collected at the newly-opened segment for a month.

    Two other segments of the project are already operational, namely the 2.20-kilometer Segment 3A-1 which starts from Merville to C5/South Luzon Expressway (SLEX), and the 1.6-kilometer Segment 3A-2 from E. Rodriguez to Merville.

    The Head of State also led the groundbreaking of the remaining two-kilometer Segment 3B of the CAVITEX C5 Link. The said segment will complete the project by connecting the Sucat Interchange to E. Rodriguez.

    It is expected to be completed next year.

    Upon completion, the P12.65 billion CAVITEX C5 Link will be a 7.7-kilometer, six-lane toll road that will decongest traffic in major business districts in Makati and Taguig, as well as in Cavite, Paranaque, and Las Pinas.

    Travel time from SLEX/C5 and CAVITEX will be shortened from 40-10 minutes.

    Another high-impact project that broke ground last week was the 1.2-kilometer CAVITEX-CALAX Link Project, which is seen to decongest traffic in Cavite, specifically along Centennial Road from Gahak to Tirona Highway.

    Per the DPWH, the project will directly link the coastal expressway and CALAX, with alignment crossing Tirona Highway at Barangay Binakayan and Daang Bangkal Road at Barangay Marulas in Kawit, and Centennial Road at Barangay Pag-asa III in Imus.

    Photos from Department of Public Works and Highways Facebook page

    Also read:

    Lawmaker bats for higher speed limits on expressways

    CALAX Silang Interchange is 91-percent finish

    Traffic volume at MPTC-operated expressways could go up to 15% on Holy Week

    Read All

    Featured Articles

    Recommended Articles For You

    Read All

    Featured Cars

    • Upcoming

    Car Articles From Zigwheels

    • News
    • Article Feature
    • Advisory Stories
    • Road Test
    • PIMS 2024: Mitsubishi PH to revive Adventure nameplate?
      PIMS 2024: Mitsubishi PH to revive Adventure nameplate?
      Paulo Papa . Today
    • Jetour PH dealerships now pet-friendly
      Jetour PH dealerships now pet-friendly
      Cesar Miguel . Today
    • Porsche Asia Pacific launches updated Taycan
      Porsche Asia Pacific launches updated Taycan
      Cesar Miguel . Today
    •  Toyota endorses ELV dismantler facility in PH
      Toyota endorses ELV dismantler facility in PH
      Cesar Miguel . Today
    • MG Motor PH opens Calamba dealership
      MG Motor PH opens Calamba dealership
      Cesar Miguel . Today
    • MG GT: pros and cons
      MG GT: pros and cons
      Cesar Miguel . Today
    • More than just a race: Toyota GR PH Cup
      More than just a race: Toyota GR PH Cup
      Paulo Papa . Today
    • Check out the GWM Tank 300’s cabin
      Check out the GWM Tank 300’s cabin
      Cesar Miguel . Oct 02, 2024
    • MG 3: pros and cons
      MG 3: pros and cons
      Cesar Miguel . Oct 01, 2024
    • MG 4 EV vs. the competition
      MG 4 EV vs. the competition
      Cesar Miguel . Sep 30, 2024
    • Here are some ideal destinations and safety tips for the upcoming Holy Week
      Here are some ideal destinations and safety tips for the upcoming Holy Week
      Paulo Papa . Mar 08, 2024
    • Here are some New Year’s resolutions for car owners
      Here are some New Year’s resolutions for car owners
      Paulo Papa . Jan 03, 2024
    • PH auto market: 2023 in retrospect
      PH auto market: 2023 in retrospect
      Paulo Papa . Dec 15, 2023
    • Here’s a holiday gift guide for car enthusiasts
      Here’s a holiday gift guide for car enthusiasts
      Hazel Nicole Carreon . Dec 15, 2023
    • Oil players cut pump prices anew
      Oil players cut pump prices anew
      Paulo Papa . Nov 14, 2023
    • 2022 Honda Civic RS Turbo CVT Honda SENSING: one of sedan segment's major thrusters
      2022 Honda Civic RS Turbo CVT Honda SENSING: one of sedan segment's major thrusters
      Ruben Manahan IV . Sep 25, 2024
    • GAC Emkoo Hybrid: Peppy, efficient powerhouse for the price-conscious
      GAC Emkoo Hybrid: Peppy, efficient powerhouse for the price-conscious
      Cesar Miguel . Sep 23, 2024
    • MG ZS Luxury: Stylish yet accessible
      MG ZS Luxury: Stylish yet accessible
      Cesar Miguel . Sep 23, 2024
    • Purposefully practical: MG G50 Plus
      Purposefully practical: MG G50 Plus
      Paulo Papa . Sep 18, 2024
    • ELECTRIA: How does the BYD Atto 3 perform doing real-world activities?
      ELECTRIA: How does the BYD Atto 3 perform doing real-world activities?
      Paulo Papa . Sep 11, 2024