SLEX Toll Road 5, Pasig River Expressway now toll road projects under TRB

TRB logo

The Toll Regulatory Board (TRB) has declared the South Luzon Expressway (SLEx) Toll Road 5 and Pasig River Expressway (PAREX) projects as toll road projects.

In a statement from its mother agency the Department of Transportation (DOTr), the two roads were declared under TRB as stated in a TRB resolution dated last June 29.

According to them, such declaration was upon the request of—and based on—the proposal submitted by the joint venture of Philippine National Construction Corporation (PNCC) and San Miguel Holdings Corporation (SMHC).

The TRB technical working group (TWG)—composed of representatives from the DOTr, Department of Public Works and Highways (DPWH), Department of Finance (DOF), and the National Economic and Development Authority (NEDA), as well as the private sector—are finalizing the details with the PNCC-SMHC.

TRB Executive Director Abraham Sales was quoted as saying that the PNCC-SMHC Joint Venture made the request for the government to recognize the two projects as toll road projects.

TRB ED Abraham Sales

“These have their respective basic design plan. The TRB has given an instruction to the TWG to discuss the details of the project with the JV that will be the basis of the concession agreements. We are also waiting for the JV to submit certain requirements,” he said.

Construction on the two projects is being eyed to start within the remaining two years of the Duterte administration.

Based on Presidential Decree (PD) 1112, the TRB has the authority to supervise, monitor and regulate the construction, operation and maintenance of toll facilities as well as the rates that may be charged.

The SLEX Toll Road 5 is 4-lane divided toll road that starts from the terminal point of the SLEx Toll Road 4 Project at Barangay Mayao, Lucena City in Quezon, and ends at Matnog, Sorsogon, near the Matnog Ferry Terminal.

Around 420 kilometers long, the latest tollway will be composed of eight segments and 28 interchanges namely:

  • Segment 1 (Lucena to Gumaca) – 61 kilometers
  • Segment 2 (Gumaca to Tagkawayan) – 58.60 kms.
  • Segment 3 (Tagkawayan to Sipocot) – 61.40 kms.
  • Segment 4 (Sipocot to Naga City) – 39.50 kms.
  • Segment 5 (Naga City to Polangui) – 45.90 kms.
  • Segment 6 (Polangui to Legaspi City) – 33.60 kms.
  • Segment 7 (Legaspi City to Sorsogon)- 57.70 kms.
  • Segment 8 (Sorsogon to Matnog) – 62.30 kms.

The project has an estimated cost of P22.6-B (for Segment 1 only) and has an implementation period of 24 months (for Segment 1 only).

Through its legislative franchise, PNCC has the authority to construct, maintain and operate the South Luzon Expressway and Skyway Stages 1, 2, 3 and all extensions, linkages or stretches from any part of the existing toll roads.

Meanwhile, the 19.365 km-stretch PAREX is set to connect Manila with Rizal with a 6-lane elevated expressway that will run over Pasig River.

PAREX starts from Radial Road 10 in Manila and will end at the South East Metro Manila Expressway at Circumferential Road 6 (C6).

The said project will connect and utilize a 2.7-kilometer portion of the Skyway Stage 3 from Nagtahan to Plaza Azul.

Once completed, PAREX will be composed of three segments:

  • Segment 1 (R-10 to Plaza Azul) – 5.74 kilometers.
  • Plaza Azul to San Juan River (MMSS3) – 2.70 kms.
  • Segment 2 (San Juan River to C5 Intersection) – 7.325 kms.
  • Segment 3 (C5 Intersection – C6 Intersection)- 6.30 kms.

The project, which was earlier approved in principle by members of the TRB Board, has an estimated project cost of P95.413-billion. Its estimated project implementation period is 36 months.

Photos from Toll Regulatory Board

Also read:

Toll Adjustment for SCTEX on Hold?

Toll Regulatory Board Seeks to Ban Buses from Skyway

MPTC has 3 Petitions for Toll Price Hike with TRB

Read All

Featured Articles

Recommended Articles For You

Read All

Featured Cars

  • Upcoming

Car Articles From Zigwheels

  • News
  • Article Feature
  • Advisory Stories
  • Road Test
  • Toyota Motor PH's dealer network 'sufficient' to attend to customer needs
    Toyota Motor PH's dealer network 'sufficient' to attend to customer needs
    Ruben Manahan IV . Today
  • BPI enjoys 37% growth in loan releases
    BPI enjoys 37% growth in loan releases
    Ruben Manahan IV . Today
  • Nissan showcases Kicks e-Power at 'Meeting of Styles PH'
    Nissan showcases Kicks e-Power at 'Meeting of Styles PH'
    Cesar Miguel . Today
  • Fresh BYD Dolphins arrive in Valenzuela City, augment local gov't, police fleet
    Fresh BYD Dolphins arrive in Valenzuela City, augment local gov't, police fleet
    Ruben Manahan IV . Today
  • Isuzu PH ‘satisfied’ with current dealer network, according to new president
    Isuzu PH ‘satisfied’ with current dealer network, according to new president
    Paulo Papa . Today
  • Here are the BYD eMAX 7's 4 hues
    Here are the BYD eMAX 7's 4 hues
    Paulo Papa . Today
  • Isuzu mu-X's 5 elegant hues in PH
    Isuzu mu-X's 5 elegant hues in PH
    Cesar Miguel . Today
  • Here's a closer look at the PH-spec BYD eMAX 7's variants
    Here's a closer look at the PH-spec BYD eMAX 7's variants
    Paulo Papa . Today
  • These are the Chery Tiggo Cross' hits and misses
    These are the Chery Tiggo Cross' hits and misses
    Cesar Miguel . Today
  • Nissan Patrol: pros and cons
    Nissan Patrol: pros and cons
    Cesar Miguel . Today
  • What should you visit first at MIAS 2025?
    What should you visit first at MIAS 2025?
    Cesar Miguel . Apr 11, 2025
  • Do you really need 4x4 for overlanding?
    Do you really need 4x4 for overlanding?
    Cesar Miguel . Mar 26, 2025
  • Number coding 2025: what you need to know
    Number coding 2025: what you need to know
    Paulo Papa . Mar 09, 2025
  • EVs still require lubrication, JAMA execs say
    EVs still require lubrication, JAMA execs say
    Paulo Papa . Mar 09, 2025
  • Ensure your vehicle is Summer road trip-ready by following these tips
    Ensure your vehicle is Summer road trip-ready by following these tips
    Paulo Papa . Mar 06, 2025
  • First drive: Changan Lumin
    First drive: Changan Lumin
    Cesar Miguel . Apr 22, 2025
  • JAC JS4: from daily drives to ‘vacay’ vibes
    JAC JS4: from daily drives to ‘vacay’ vibes
    Paulo Papa . Apr 22, 2025
  • First drive: Jetour X70 Lightning i-DM
    First drive: Jetour X70 Lightning i-DM
    Paulo Papa . Apr 03, 2025
  • Changan CS15: no-fuss daily driver
    Changan CS15: no-fuss daily driver
    Cesar Miguel . Mar 27, 2025
  • First drive: Mercedes-Benz EQE 350+ AMG Line
    First drive: Mercedes-Benz EQE 350+ AMG Line
    Paulo Papa . Mar 21, 2025